Severe Thunderstorm
Damaging wind, hail, or lightning with the building occupied.
Three things have to be true before any organization is genuinely prepared — a school, a plant, a clinic, a congregation, all the same three: the plan has to exist, the people have to know it, and someone has to be able to set it in motion. GWSafePlan is built around those, and nothing else.
An AI interview sits down with whoever knows the building best — a facilities lead, an office manager, a principal, a deacon — and asks its way through a FEMA CPG-101 aligned Emergency Operations Plan. No committee cycle, no blank template, no eleven-month wait for a consultant’s draft.
Occupancy, exits, who holds keys, where the AEDs live, which rooms have no windows. Plain questions, no jargon, no forms to download.
Tell it you are a school, a clinic, a plant, or a congregation and every question, seat, and annex title changes to match. Annex I is Student Supervision at a school and Children’s Ministry at a church — same federal structure, your words.
The interview drafts. A human reviews, edits, and signs. The plan carries your leadership’s signature because it is your plan.
The Basic Plan, Annexes A through L, and a COOP — exported to PDF and Word, ready for your insurer and your county emergency manager.
Plan sections
Prose is not something a substitute teacher, a shift supervisor, or a nineteen-year-old volunteer can run in the moment. GWSafePlan renders every hazard in your plan as a sequence — who does what, in what order, by when — drawn from your own annexes and your own ICS chart.
Switch the sector below and watch the steps hold while the words change. The order is federal doctrine; the vocabulary is yours. Anyone on your team can pull a workflow on a phone, in the room, and you can print them for the go-bag too.
Objective — Everyone out, doors closed behind them, and a head count that matches the roster.
Only if you can do it without entering the fire area yourself.
Pulling the alarm is not the same as calling. Do both.
“Evacuate the building now using your nearest exit. Leave your belongings. Do not use the elevators.”
Voice + SMS to Incident Commander, Operations Chief, Safety Officer, Student Supervision Lead
A closed door buys minutes. Do not lock them; responders need access.
Youngest rooms first. Staff carry the roster out, not the sign-in sheet.
Restrooms, the gymnasium, mechanical rooms, storage. Mark each door as cleared.
By room and by group. Report anyone missing to the Principal acting as Incident Commander.
Only the fire department authorizes re-entry. Not the alarm panel, not staff.
This is the part a binder can never do. Declare an incident and an AI voice agent calls and texts your whole response team, reads them the situation and the first action for their seat, and records who picked up — while you are still walking down the hall.
The fan-out walks your ICS chart in order. If a seat does not answer, the next person on that bench is dialled without anyone having to notice.
Each channel degrades on its own. A carrier outage costs you texts, never the activation.
Every call, acknowledgement, and step is timestamped. Afterwards you have a record for your insurer, your board, and your own debrief.
Drills use exactly the same machinery, which is the only way a drill is worth running. Every drill call opens and closes with “This is a drill.”
Incident timeline
Eleven things you will use in the first ninety days.
Plain questions in, CPG-101 language out. Resume any time; the interview remembers where you stopped.
Pick your organization type once and the questions, annex titles, seat names, and announcements all change to your words. The structure underneath never moves.
Edit any section, and the annexes that depend on it are flagged for review rather than silently going stale.
Eleven seats, each with recommended alternates. Readiness scoring flags any seat one illness away from empty.
Every hazard rendered as an ordered, role-assigned sequence with target times, drawn from your own annexes.
An outbound AI voice agent reads each seat its first action and records who acknowledged, primary before alternate.
Five plain-language announcements, said verbatim, printed on cards for the front desk, the office, and wherever the microphone lives.
Primary and secondary assembly points, sweep zones, and the reunification site, all attached to the plan.
The FEMA cadence built in, with reminders, attendance, response times, and a written after-action every time.
PDF and Word for the board packet, with the signature page, distribution list, and record of changes intact.
Go-bag cards and wall posters, because the plan has to work when the power does not.
NIMS and ICS are the language every responding agency already speaks, and the seats do not change from sector to sector — only who sits in them. Your Incident Commander might be a principal, a site manager, an administrator, or a senior pastor; when they introduce themselves to the fire captain by that title, the conversation goes faster.
Overall command of the incident · Resource allocation
Hazard assessment · Personnel safety
Media coordination · Public messaging
Coordination with police · Coordination with fire department
Security operations · Medical operations
Access control · Threat assessment
First aid · AED deployment
Incident documentation · Situation reports
Supplies · Equipment
Damage documentation · Insurance coordination
Roster accountability for every classroom · Head counts at the assembly area
In that order, always. Property never outranks a person.
Announced verbatim over the PA. Plain language, because NIMS calls for it and because a visitor, a substitute teacher, a contractor on their first day, and the officer arriving in four minutes have never seen your code chart.
The FEMA hazard set, scored for your building and your county rather than copied from a template. Four are mandatory in every plan we write, no matter what your risk assessment says — and your sector pushes a few more up the list, which is why a clinic and a warehouse end up with different drafting orders from the same eighteen.
Damaging wind, hail, or lightning with the building occupied.
Warning issued or funnel sighted with the building occupied.
Named storm on track; days of warning but a large operational lift.
Rising water threatening the site, parking, or access roads.
Ice or snow making travel and egress unsafe.
Heat emergency, often paired with HVAC or power failure.
Armed attacker on site. Run, Hide, Fight. Every second counts.
Targeted attack against the people here or the building itself.
Protest or disruption at the property line or inside the building.
Threat received by phone, mail, or online. Do not use radios nearby.
Threat or assault involving staff, volunteers, or a domestic dispute.
Unattended or unexpected item found on site.
A child or dependent person is unaccounted for. Lock the site down.
Smoke or flame anywhere on site. R.A.C.E. and evacuate.
Cardiac arrest, fall, or overdose. The most likely activation you will ever run.
Loss of power, water, or HVAC with the building occupied.
Ransomware, payment fraud, or a breach of personal records.
Release on site or nearby — gas leak, chemical spill, highway incident.
Roof, balcony, or floor compromise. Older buildings carry real risk.
This is the CPG-101 outline your county emergency manager, your insurer, and your accreditor already recognize — the same outline whether the building is a school, a plant, a clinic, or a sanctuary. Nothing is padding: every section exists because someone will need it in a hallway one day.
Emergency Operations Plan
Riverbend Middle School
Effective March 2026 · Revision 3
Signed by your leadership, your board, and your safety coordinator. The Record of Changes maintains itself.
Who this plan belongs to, who owns it, and when it was last reviewed.
Everyone who must hold a copy, including your law enforcement and fire liaisons.
The framework for protecting life, property, and mission continuity.
Who the plan covers and which gatherings it applies to.
Your building, your attendance, and the population you are responsible for.
The threats you have actually scored, not a generic list.
How the plan runs under NIMS and ICS, and in what priority order.
Named people in named seats, with alternates who can actually show up.
Who has authority, in what order, and when Unified Command is formed.
Primary, secondary, and tertiary channels — plus your emergency codes.
The codes, policies, and agreements this plan is actually written against.
Triggers, routes, assembly areas, and how you prove everyone is out.
When staying inside is safer than leaving, and exactly where people go.
Announcing, securing, and holding until law enforcement clears you.
Run, Hide, Fight — plus reunification and crisis counseling afterward.
R.A.C.E., extinguisher program, and inspection cadence.
Your medical response team, your AED locations, and who meets EMS.
Where people go for a tornado, and which spaces you must avoid.
The caller checklist, who gets notified, and the no-radio rule.
Rosters, head counts, and releasing a child or dependent person only to an approved guardian.
Ransomware, payment fraud, and personal data breach response.
Normal-day access control and what changes at elevated threat.
The four phases from life safety through long-term recovery.
Where families are sent, how you prove who they are, and how a child leaves with the right adult.
Everyone who cannot self-evacuate, self-shelter, or hear the announcement — and the named person who helps them.
Essential functions and where you operate if the building is unusable.
Annual required training and recommended leadership coursework.
Drill cadence, and the evaluation that turns a drill into a corrected weakness.
Safety equipment and emergency supplies, with locations and expiry dates.
Every revision, who approved it, and when — plus the named owner who keeps this plan alive.
Signatures from leadership, the board, and your coordinator.
A plan approved in March and never touched again is a plan that expires quietly. GWSafePlan keeps score: the drills you owe, the training that lapsed, the AED pads with a date on them, and the seats with nobody behind them.
Readiness score
One number your board can read in a second, and four lists that tell you exactly what would move it. Amber is a nudge, never an alarm.
Fire Drill · Twice per year · Evacuation Drill · Annual · Lockdown Drill · Annual · Tabletop Exercise · Annual · Full-Scale Exercise · Every 3 years
NIMS IS-100 · NIMS IS-700 · CPR/AED · Active Threat Awareness · Fire Safety
If yours is not here, ask it. We would rather answer plainly than have you guess.
Sit down with whoever knows the building best. By the end of the day you will have a real plan, real workflows, and a team that can be reached in seconds. Not a binder. A light left on.
No credit card to start. Export your plan at any time, even if you leave us.